logo
Send Message

Ladle Refining Furnace Steel Smelting Furnace 10T-160T With Accurate Temperature Control

1
MOQ
Negotiation
Price
Ladle Refining Furnace Steel Smelting Furnace 10T-160T With Accurate Temperature Control
Features Gallery Product Description Request A Quote
Features
Specifications
Type: Ladle Refining Furnaces
Use: Melting Furnace
Core Components: PLC
Showroom Location: Egypt, Turkey, United States, France, Germany, Viet Nam, Philippines, Brazil, Saudi Arabia, Indonesia, Pakistan, India, Mexico, Russia, Kenya, Chile, UAE, Colombia, Kazakhstan, Australia
Highlight:

Steel Smelting Furnace 10T

,

Ladle Refining Furnace 10T

,

Accurate Ladle Refining Furnace

Basic Infomation
Place of Origin: Shaanxi, China
Brand Name: AE
Certification: CE;ISO9001;ISO14001;OHSAS 18001
Payment & Shipping Terms
Delivery Time: 30-90work days
Product Description

                                               Ladle Refining Furnace           

Ladle Refining Furnace Melting Furnace 10T-160T with and Accurate Temperature Control                       

 

Product introduction

Ladle Refining Furnace is used to refine the molten steel from primary melting furnace (electric arc furnace, induction furnace, converter and etc.), meanwhile have the function of adjusting molten steel temperature, and be a buffer of the whole process. It is described to be soul of the best production line ( primary melting furnace + LF+ CCM). It is widely used in refining of kinds of steel grade, such as Ball bearing steel, alloy structural steel, tool steel, spring steel, carbon steel and etc. 

Characteristic: 

1. Even the molten steel composition and temperature

2. Desulfidation, Degassing, deoxidation and remove non-metallic impurities.

3. Increase production capacity.

 Adoption of new technology:

1. Tubular water cooled furnace lid

2. Electrode lifting mechanism ( single phase, three phase)

3. Optimize large current system structure (energy-saving type)

4. PLC controller of electrode automatic lifting regulator

5. Automatic control argon blowing system

6. Frequency control ladle car

7. Industrial automatic control

8. Network technique

 Main Technical Specifications:

LadleRated Capacity (ton)

Ladle Diameter  (mm)

Transformer Rated Capacity (KVA)

Electrode Diameter (mm)

Electrode distribution circle Diameter (mm)

Molten steel Temperature raising speed    (Co /min)

20

2200

3150

200

500

2-3

40

2900

6300

350

650

2-3

60

3100

10000

350

650

2-3.5

70

3200

12500

400

700

2-3.5

100

3400

18000

400

700

2-3.5

150

3900

20000

450

800

2-3.5

 

After sales:
 
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
Recommended Products
Get in touch with us
Tel : +86-13991372145
Characters Remaining(20/3000)